ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D
DOI:
https://doi.org/10.62335/sinergi.v2i7.1506Keywords:
Construction Cost Estimation, Time Comparison, 5D BIM, BIM Technology, Construction Project EfficiencyAbstract
This study compares the cost estimation time for structural work between conventional methods and 5D BIM for the Precision 5 National Police Building Project. Using a quantitative approach and case study, data was obtained from project documentation and simulations. The results show that 5D BIM significantly accelerated the estimation process without compromising accuracy.