ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D

Authors

  • Edison Hatoguan Manurung Universitas Mpu Tantular Author
  • Kerlima Hutagaol Universitas Mpu Tantular Author
  • Dizzy Putrafakhmi Universitas Mpu Tantular Author

DOI:

https://doi.org/10.62335/sinergi.v2i7.1506

Keywords:

Construction Cost Estimation, Time Comparison, 5D BIM, BIM Technology, Construction Project Efficiency

Abstract

This study compares the cost estimation time for structural work between conventional methods and 5D BIM for the Precision 5 National Police Building Project. Using a quantitative approach and case study, data was obtained from project documentation and simulations. The results show that 5D BIM significantly accelerated the estimation process without compromising accuracy.

Downloads

Published

2027-07-16

How to Cite

Manurung, E. H., Hutagaol, K., & Putrafakhmi, D. (2027). ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D. SINERGI : Jurnal Riset Ilmiah, 2(7), 3147-3157. https://doi.org/10.62335/sinergi.v2i7.1506

Similar Articles

101-110 of 146

You may also start an advanced similarity search for this article.