PENDAMPINGAN PENGUKURAN VOLUME PEKERJAAN TROTOAR

Authors

  • Endah Atika Politeknik Madyathika Author
  • Galih Saputra Politeknik Madyathika Author

DOI:

https://doi.org/10.62335/besiru.v3i1.2236

Keywords:

pendampingan teknis, trotoar, volume pekerjaan

Abstract

Sidewalk construction is an essential component of urban infrastructure development that supports pedestrian safety, comfort, and accessibility. However, in practice, discrepancies are often found between the installed work volumes and the planned calculations, mainly due to limited technical understanding, insufficient accuracy in field measurements, and a lack of technical assistance. These conditions may lead to quality issues, cost overruns, and disputes during project implementation. This Community Service activity aims to provide technical assistance to partners in measuring and verifying sidewalk construction volumes so that the execution process becomes more accurate, transparent, and compliant with applicable technical standards. The implementation methods include delivering basic material on construction volume measurement, conducting hands-on field measurement practices, and facilitating discussions and evaluations of the measurement results in a participatory manner. Through this activity, partners are expected to improve their understanding and skills in properly measuring sidewalk construction volumes, thereby minimizing calculation errors and enhancing the quality and sustainability of construction work control.

Downloads

Published

2026-01-24

How to Cite

Atika, E., & Saputra, G. (2026). PENDAMPINGAN PENGUKURAN VOLUME PEKERJAAN TROTOAR. BESIRU : Jurnal Pengabdian Masyarakat, 3(1), 107-112. https://doi.org/10.62335/besiru.v3i1.2236

Most read articles by the same author(s)

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

Similar Articles

1-10 of 85

You may also start an advanced similarity search for this article.