[1]
E. H. Manurung, K. Hutagaol, and D. Putrafakhmi, “ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D”, SINERGI, vol. 2, no. 7, pp. 3147–3157, Jul. 2027, doi: 10.62335/sinergi.v2i7.1506.