[1]
E. H. Manurung and A. Febriadi, “PENGARUH PENERAPAN METODE KONSTRUKSI MODULAR TERHADAP EFISIENSI WAKTU DAN BIAYA DALAM PROYEK KONSTRUKSI BANGUNAN”, SINERGI, vol. 3, no. 1, pp. 485–489, Jan. 2026, doi: 10.62335/sinergi.v3i1.2315.