Manurung, E.H., Hutagaol, K. and Putrafakhmi, D. (2027) “ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D”, SINERGI : Jurnal Riset Ilmiah, 2(7), pp. 3147–3157. doi:10.62335/sinergi.v2i7.1506.