Manurung, E. H., Hutagaol, K., & Putrafakhmi, D. (2027). ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D. SINERGI : Jurnal Riset Ilmiah, 2(7), 3147-3157. https://doi.org/10.62335/sinergi.v2i7.1506