1.
Manurung EH, Hutagaol K, Putrafakhmi D. ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D. SINERGI. 2027;2(7):3147-3157. doi:10.62335/sinergi.v2i7.1506