(1)
Manurung, E. H.; Hutagaol, K.; Putrafakhmi, D. ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D. SINERGI 2027, 2 (7), 3147-3157. https://doi.org/10.62335/sinergi.v2i7.1506.