[1]
Manurung, E.H. et al. 2027. ANALISIS PERBANDINGAN WAKTU DALAM ESTIMASI BIAYA PEKERJAAN STRUKTUR PROYEK GEDUNG PRESISI 5 POLRI: METODE KONVENSIONAL VS BIM 5D. SINERGI : Jurnal Riset Ilmiah. 2, 7 (Jul. 2027), 3147–3157. DOI:https://doi.org/10.62335/sinergi.v2i7.1506.