PEMBUATAN SITE PLAN RENCANA PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PEDESAAN DI KELURAHAN BUSOA

Authors

  • Ahmad Efendi Universitas Muhammadiyah Buton Author
  • Agus Syafruddin Dinas PUPR Buton Selatan Author

DOI:

https://doi.org/10.62335/maju.v3i4.2853

Keywords:

Site plan, septic tank, rural sanitation

Abstract

The limited availability of sanitation facilities and technical understanding among the community in Busoa Village poses a risk of contaminating clean water sources and threatening environmental health. This community service project aims to prepare a Site Plan Design Document (2D Plan Layout) for the construction of individual-scale septic tanks for 25 targeted households that comply with engineering standards. The methodology employed an engineering spatial mapping and two-dimensional site planning approach executed through three main stages: a GPS-based geotagging survey, draft digitization using CAD software, and participatory validation with residents and local government via Focus Group Discussions (FGD). This initiative successfully produced an A3-standardized 2D Site Plan Design Document in both hardcopy and softcopy formats. This output serves as a technical guideline for self-managed community sanitation arrangement and acts as a blueprint for local governments in planning settlement programs and distributing sustainable sanitation assistance

Downloads

Published

2026-07-30

How to Cite

Efendi, A., & Agus Syafruddin. (2026). PEMBUATAN SITE PLAN RENCANA PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL PEDESAAN DI KELURAHAN BUSOA. MAJU : Indonesian Journal of Community Empowerment, 3(4), 609-617. https://doi.org/10.62335/maju.v3i4.2853

Similar Articles

1-10 of 15

You may also start an advanced similarity search for this article.